The Capital Towers The Capital Towers
 

Floor Plan

TOWER III (Rio Tower)

One Bedroom
Two Bedroom
Two Bedroom Corner Unit
TOWER II (Beijing Tower)
» 8th to 30th Floor Plan

» 31st to 38th Floor Plan
» A+B High Zone
» A+B Low Zone
» M+N High Zone
» U+V Low Zone
» V+W High Zone


SOHO UNITS

SOHO

TOWER I (Athens Tower)
» 2nd and 5th Floor Plan

» 3rd and 6th Floor
» 7th Floor (Amenity Level)
» 8th - 36th Floor (Even Numbers)
» 9th to 35th Floor (Odd Numbers)
» 37th Floor
» 38th Floor
» Commercial Spaces

UNIT LAYOUT
Click to enlarge

Federal Land Properties
One Bedroom 33 sqm.

One Bedroom 45 sqm.

Two Bedroom @ 65sqm

Federal Land Properties

Two Bedroom @ 73sqm

Federal Land Properties

Two Bedroom @ 74sqm

Two Bedroom @ 84sqm

Two Bedroom @ 66sqm
(Combined Unit)
 

For interested buyers, click here

DISCLAIMER: The developers reserve the right to change the product features, prices and terms without prior notice and approval. Further commitment or undertaking is being made in the presentation of the material. The illustrations and renderings shown herein are for illustration purposes only. The developers will not assume any legal or financial responsibility for the information contained herein.


PROJECT INTELLIGENCE

Hallway Corridor

Lobby Entrance
- impressive grand entrance with view of the reflecting pool and landscape garden

Floor:   Ceramic Tiles
Wall:    Painted Plastic plaster
Ceiling: Painted Gypsum Board

Elevator Lobby

Floor:   Ceramic Tiles
Wall:    Painted Plastic plaster
Ceiling: Painted Gypsum Board

Function Room

Floor:   Ceramic Tiles
Wall:    Painted Plastic plaster
Ceiling: Painted Gypsum Board

Living / Dining / Bedrooms : Wood Flooring

Kitchen

(Enclosed Type)       : Ceramic Tiles
(Open Type)            : Wood Flooring
Utility / Maid's Room : Colored cement finish
Toilet & Bath           : Ceramic Tiles


WALL FINISH
Living / Dining plaster : Painted cement
Bedroom plaster        : Painted cement
Kitchen plaster          : Painted cement
Utility Room              : Painted cement
Maid's Room plaster   : Painted cement

CEILING FINISH
Living / Dining concrete : Painted rubbed
                                  : painted gypsum board
Bedroom concrete        : Painted rubbed
Kitchen Area concrete : Painted rubbed
Utility / Maid's Room concrete : Painted rubbed
                                          : painted gypsum board
Toilet & Bath : Painted gypsum board

KITCHEN AREA

. Kitchen Base Cabinet only
. Laminated doors on melamine carcass with China granite countertop and   100 mm high China granite splashboard


AIR CONDITIONING
- Provision for window type unit
- WACU opening with temporary glass enclosure
- Convenience outlet provision
- Provision for split-type
- Provision for pipe sleeve at external wall for refrigerant type
- Provision of FCU drain
- Provision of power circuit breaker at ACCU area


OTHER UNIT FEATURES
. MECHANICAL VENTILATION
   - Provision of mechanical exhaust / ventilation duct for kitchen and Toilet & Bath

. CLOSET
    
- Bedroom closet provided with laminated doors on melamine carcass


UNIT HEIGHT
Unit Floor to Floor Height : 3.00 m.
Unit Floor to Underside of Slab : 2.75 m.
Kitchen Ceiling : 2.40 m.
Toilet and Bath : 2.20 m.


POWER SUPPLY

Generator
Common areas : 100% power supply back-up
Residential unit : min. of 30% power supply back-up

COMMUNICATION
. Provision for telephone lies
. Provision for Cable TV

MECHANICAL
Elevator :               2 passenger elevators, 1 passenger service elevator
Load Capacity :       900 kilos lift capacity (ave. 14-15 persons)
No. of Passengers : Transports average of 43 persons every 5 minutes
Speed :                 2.5 sec. floor to floor with 30-32 sec. waiting time only

FIRE PROTECTION / ALARM
- Water sprinkler system
- Fire alarm and detection system

CONCEALED TOILET PIPING

Advantages
. All plumbing pipework relevant to a particular apartment are kept within   that apartment.
. Vent piping will be drastically reduced.
. Eliminates occurrence of the following:
. Smell caused by tenant above.
. Drying of trap seal
. Leaks from exposed pipeworks.
. Maintenance will be confined within their own apartment, eliminating the need to disturb unit tenant below.
. Considerable cost reduction to the following (due to possible reduction of floor to floor height).
. Structural concrete and rebar.